from a Coventry Reader.
Sen eek ene factory of Pressed Steel Fisher was shut down for the tin smiths ace folledon wen Docombers ‘This arose because thirty peecieeknuice) : owing their union pelicy and only working four days to an, 1 eleven sheet metal workers, sacked in November, are
ng pobe either with Fisher's or with sther firms. : Werkergt ign involved is the Birmingham and District Sheet Metal in AeuA Leuk idee aches ce management about the eleven men ended
: : en the tin-smiths have imposed their owm oe oe sharing. This action is one that could have been use-
y adopted by other workers faced with similar situations. WORK i}